The master working on the frame:


Tops were put in:

Base pluming and sides added:

Test fitting the kegs. Note the "hot tub" for a liquor tank!

Adding the CFC and water filtration system. I still can't believe he got that monster of a CFC to fit.

Pump added:

Hot liquor tank (aka, Hot Tub) finished. Now THAT is a probe!

Sight glass for wort flow. Custom made.

Mash tun plumbing

Stir motor for the hot tub

once it was all put together, Swagman ran it through Sea Trials to make sure everything worked. I had to brew at his shop with the system in front of all the Don's (no pressure there) before I could take the system home.
Once home, I had to take the entire system apart to sand and paint. Ugh!!!
Stripped down system

All the parts. How does this go back together?

Time to start sanding

First of many coats of primer

Frame is painted, now comes the hard part, putting it back together.

Re-assembly of control unit

Plumbing and pump installed

Hooking up the Hot Tub

All back together and it works (by the way Jason, you might want to turn the power switch to "ON" before you call for help)

I can not tell you how lucky I am to have one of Swagman's rigs. He is truly a master craftsman. He has taught me so much about brewing the past year, is a master brewer, has been a good friend and is just a truly awesome guy. Just wanted to say thanks for all your hard work and artistry.
Jason
