Big rig progression
Posted: Fri Oct 19, 2007 9:53 pm
Blktre and I have once again been trying to make head way on the big rig. Here are some pics of the HLT electric element portion that some of you have seen plans or parts.
Parts before work...

Parts have been machined and welded.
[/img]
Pump has been purchased and the electronic control panel is built.

To the right of the pump will be a T and valves that will allow water to be in circulation or pumped to the mash tun. The right hand side of the picture shows the two 90's attached to each other but will be extended between so the return is at the top of the kettle. Nothing about this rig will be off shelf and that's why it's taking a long time to build it...Well that and lack of funds
Cheers!
Jarrell[/img]
Parts before work...

Parts have been machined and welded.
[/img]Pump has been purchased and the electronic control panel is built.

To the right of the pump will be a T and valves that will allow water to be in circulation or pumped to the mash tun. The right hand side of the picture shows the two 90's attached to each other but will be extended between so the return is at the top of the kettle. Nothing about this rig will be off shelf and that's why it's taking a long time to build it...Well that and lack of funds
Cheers!
Jarrell[/img]